Call (07) 3523 1792

Servicing Brisbane, QLD.

Call (07) 3523 1792

Underpinning prices in Brisbane

This site doesn't set or quote prices. What an underpinning job costs depends on why the house moved and how the footing can be reached, so a price has to come from a provider who has looked at it. What government does publish are the fees and limits around the job: Council's fees, QBCC's cap on deposits and its insurance rules, each with its dollar amount and the date we read it.

Call (07) 3523 1792

Rules by job value

Type the job's value and the rules that apply to it are highlighted. Each is the Queensland Building and Construction Commission's own line, with the page it comes from and the date it was read, and every rule is listed below whether or not you type anything.

Queensland rules for an underpinning job
RuleApplies when the job is valued atSource
The contractor must hold a QBCC licence for building work valued over A$3,300. Ask to see it before you sign or hand over money.About underpinningover A$3,300QBCC, Who must hold a QBCC licence · read
Home warranty insurance is compulsory for residential construction work valued at more than A$3,300, counting materials, labour and GST.About underpinningover A$3,300QBCC, What is home warranty insurance · read
The contract must be written, dated and signed by both parties before work begins. The regulator says a contract is not required for work valued at less than A$3,300.About underpinningA$3,300 or moreQBCC, Contracts and agreement types · read
The maximum deposit is 20%.About underpinningA$3,300 or lessQBCC, Deposits and progress payments · read
The maximum deposit is 10% of the contract price.About underpinningmore than A$3,300 and less than A$20,000Queensland Building and Construction Commission Act 1991, schedule 1B section 33 · read
Queensland Building and Construction Commission Regulation 2018 section 45 · read
The maximum deposit is 5% of the contract price.About underpinningA$20,000 or moreQueensland Building and Construction Commission Act 1991, schedule 1B section 33 · read
Queensland Building and Construction Commission Regulation 2018 section 45 · read
The contract must include advice about your right to a cooling-off period. You can generally withdraw within five business days; withdrawing usually costs A$100 plus the contractor's reasonable out-of-pocket expenses.About underpinningover A$3,300QBCC, Cooling-off period · read
QBCC, Cooling-off period · read
The cooling-off period starts only once you also hold a copy of the QBCC Consumer Building Guide.About underpinningA$20,000 or moreQBCC, Cooling-off period · read

This lists each source's own lines as read; it is not legal advice, and it sets no price. The value that counts is the value of the work, including materials, labour and GST.

What moves an underpinning quote, and the fees around it

Three things decide what a provider has to price, and each has a published source. The first is the cause. CSIRO says that where building movement is caused by a water service, roof plumbing, sewer or stormwater failure, the remedy is to repair the problem, and that with local shear or erosion, cracking will usually continue to develop until the original cause has been remedied. A quote that repairs the footing and leaves the cause is a different job from one that deals with both. The second is the ground: CSIRO says soil classification is generally provided by a geotechnical report, and QBCC says most Queensland homes are built on clay soils. The third is the dig: CSIRO says excavation around footings must be properly engineered, and Brisbane City Council's guideline classes filling or excavation directly related to underpinning as building work, giving underpinning works below an existing building as its own example. A certifier is therefore part of the job before anyone digs, and Council requires building approval for filling or excavating more than one vertical metre of land for a building or structure.

Brisbane City Council's Schedule of Fees and Charges 2026-27, adopted by Council resolution on 25 June 2026 and read on 25 September 2026, prices some of the steps around such a job. A copy of an existing building approval is A$191.05 per building record, which is worth asking for when you need to know what was built under your house. A pre-application meeting with Council is A$600 per hour or part hour, including GST. Where a job needs a development application, the schedule sets a flat fee of A$750 for minor building work on a dwelling house, and its examples are an additional room, garage, swimming pool, deck, carport or shed. Underpinning is not among them, and we searched the schedule for the word and found no fee under that name, so which fee applies to an underpinning application is Council's decision. Council's fees are not the provider's price, and they apply to the 2026-27 financial year only.

Before you agree to a price

Ask each provider for a QBCC licence number and class, since building work above A$3,300 is licensed. QBCC says the contractor must take out home warranty insurance on your behalf for insurable residential construction work valued at more than A$3,300, that the cover pays up to a maximum of A$200,000 on claims, and that the contractor collects the premium from you as part of the deposit. Ask whether your job is insurable work and where the premium sits in the price. QBCC also caps the deposit: 10% of the contract price for work valued at A$3,301 to A$19,999, and 5% for work valued at more than A$20,000. Check a quote's deposit against those lines before you pay it. Then ask what cause the quote assumes, because a price that repairs a symptom only may not be the whole cost.

Costs and fees by service

No price is shown for any service on this site. The figures on this page are government fees and thresholds, not prices: Council's three fees, the licence and insurance line at A$3,300, QBCC's cap on claims and its two deposit caps.

Call (07) 3523 1792

Request a free quote

Last reviewed · Updated · First published